Differences between revisions 2 and 3
Revision 2 as of 2014-05-24 22:41:06
Size: 703
Comment:
Revision 3 as of 2014-05-25 06:48:23
Size: 1321
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
SSP Assembly Challenges      Gordon Woodcock
 . 4000 MW solar cell
 . 2000 MWe to grid(?)
 . High Temp Superconductors ??? 77K
Line 8: Line 12:
Introduction to Space Solar Power for the Global Electric Power Utility Market
 . WiSEE SSP Workshop
 . November 8, 2013
 . Baltimore, MD
 . Darel Preble
 . President, Space Solar Power Institute www.solarsat.org
 . Chair, Space Solar Power Workshop www.sspi.gatech.edu
 . p24 Sidelobe Graph - 0.01mW/cm^2^ peak at 440km radius
 . Predicted ground-level microwave power density for a full-power GEO SPS as a function of distance -Credit: J. M. Osepchuk, IEEE Microwave, “How Safe Are Microwaves and Solar Power from Space”, IEEE Microwave magazine, vol. 3, issue 4. page 58-64, Dec. 2002.
 . p34 Communication satellites are now a $250+ Billion industry per year.
 . p42 GSO launches and forecast
Line 9: Line 24:
Introduction to Space Solar Power for the Global Electric Power Utility Market
WiSEE SSP Workshop
November 8, 2013
Baltimore, MD
Darel Preble
President, Space Solar Power Institute www.solarsat.org
Chair, Space Solar Power Workshop www.sspi.gatech.edu

p24 Sidelobe Graph - 0.01mW/cm^2^ peak at 440km radius

Predicted ground-level microwave power density for a full-power GEO SPS as a function of distance -Credit: J. M. Osepchuk, IEEE Microwave, “How Safe Are Microwaves and Solar Power from Space”, IEEE Microwave magazine, vol. 3, issue 4. page 58-64, Dec. 2002.

p34 Communication satellites are now a $250+ Billion industry per year.
-----
Mission design of WPT Space Demonstration Experiment using Small Scientific Satellite toward SPS     Tanaka
 . 5.729 GHz 370km orbit 200kg 2kW 1.9m antenna
 . ground 16μW/m2(MAX)Beam width on the ground φ ~30km
-----
SSP: Hearts and Minds     Brent Sherwood
 . p8 Geopolitics: Urban Geography from GEO city longitude
-----
Contreras LEO 1620
-----

GEO-SBSP2

NOTES:


SSP Assembly Challenges      Gordon Woodcock

  • 4000 MW solar cell
  • 2000 MWe to grid(?)
  • High Temp Superconductors ??? 77K


Introduction to Space Solar Power for the Global Electric Power Utility Market

  • WiSEE SSP Workshop
  • November 8, 2013
  • Baltimore, MD
  • Darel Preble
  • President, Space Solar Power Institute www.solarsat.org
  • Chair, Space Solar Power Workshop www.sspi.gatech.edu
  • p24 Sidelobe Graph - 0.01mW/cm2 peak at 440km radius

  • Predicted ground-level microwave power density for a full-power GEO SPS as a function of distance -Credit: J. M. Osepchuk, IEEE Microwave, “How Safe Are Microwaves and Solar Power from Space”, IEEE Microwave magazine, vol. 3, issue 4. page 58-64, Dec. 2002.
  • p34 Communication satellites are now a $250+ Billion industry per year.
  • p42 GSO launches and forecast


Mission design of WPT Space Demonstration Experiment using Small Scientific Satellite toward SPS     Tanaka

  • 5.729 GHz 370km orbit 200kg 2kW 1.9m antenna
  • ground 16μW/m2(MAX)Beam width on the ground φ ~30km


SSP: Hearts and Minds     Brent Sherwood

  • p8 Geopolitics: Urban Geography from GEO city longitude


Contreras LEO 1620


GEOSBSP2 (last edited 2015-01-16 04:54:13 by KeithLofstrom)