Differences between revisions 3 and 4
Revision 3 as of 2014-05-25 06:48:23
Size: 1321
Comment:
Revision 4 as of 2014-05-25 23:32:51
Size: 1335
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
NOTES: 2013 Conference NOTES:
Line 9: Line 9:

GEO-SBSP2

2013 Conference NOTES:


SSP Assembly Challenges      Gordon Woodcock

  • 4000 MW solar cell
  • 2000 MWe to grid(?)
  • High Temp Superconductors ??? 77K


Introduction to Space Solar Power for the Global Electric Power Utility Market

  • WiSEE SSP Workshop
  • November 8, 2013
  • Baltimore, MD
  • Darel Preble
  • President, Space Solar Power Institute www.solarsat.org
  • Chair, Space Solar Power Workshop www.sspi.gatech.edu
  • p24 Sidelobe Graph - 0.01mW/cm2 peak at 440km radius

  • Predicted ground-level microwave power density for a full-power GEO SPS as a function of distance -Credit: J. M. Osepchuk, IEEE Microwave, “How Safe Are Microwaves and Solar Power from Space”, IEEE Microwave magazine, vol. 3, issue 4. page 58-64, Dec. 2002.
  • p34 Communication satellites are now a $250+ Billion industry per year.
  • p42 GSO launches and forecast


Mission design of WPT Space Demonstration Experiment using Small Scientific Satellite toward SPS     Tanaka

  • 5.729 GHz 370km orbit 200kg 2kW 1.9m antenna
  • ground 16μW/m2(MAX)Beam width on the ground φ ~30km


SSP: Hearts and Minds     Brent Sherwood

  • p8 Geopolitics: Urban Geography from GEO city longitude


Contreras LEO 1620


GEOSBSP2 (last edited 2015-01-16 04:54:13 by KeithLofstrom)